Design-build remodeling with a dedicated project manager, in-house cabinetry, tile, and finish crew. Fixed-price contracts. Weekly written progress updates.
✓NARI Certified Remodeler on staff
✓Fixed-price contracts — no cost-plus surprises
✓In-house cabinetry, tile, and finish carpentry
✓Weekly Friday update with photos and % complete

Top 3% nationally
We do not treat every project in this category as the same job. Scope, disruption, budget, and long-term value change depending on which path fits the house and your actual goals
Kitchen remodels
Cabinetry, appliances, lighting, plumbing, flooring, and finish sequencing all collide here, so management matters as much as craftsmanship.
Bath remodels
These jobs are won or lost in waterproofing, slope, backing, venting, and finish details you rarely see after tile goes up.
Basements / full interiors
These projects touch framing, insulation, mechanicals, egress, and moisture management before they ever become finish work.
Every line item below is in the contract. No surprises, no "we'll figure it out on-site." If we do the work, these are part of the price.
Design consultation
Measure, scope interview, rough 3D layout.
Materials spec
Cabinets, counters, tile, fixtures — all specified and ordered by us.
Demo + disposal
Contained demo. Negative-air machines for dust. Dumpster on-site.
Structural
Walls, headers, LVL beams if needed. Permits pulled by us.
MEP
Licensed subs for electrical, plumbing, HVAC — we coordinate, they don't run the job.
Drywall + paint
Level 4 finish standard, level 5 available.
Finish carpentry
Cabinets, trim, doors — by our crew, not a sub.
Punch + sign-off
Walk the whole space, list issues, fix, walk again.
CATCH IT EARLY AND THIS IS A
ROOFING JOB.
WAIT TOO LONG AND IT BECOMES
ROOFING + DECKING + INSULATION +
CEILING.
Layout pain every day
If the room fights how you live, finishes alone usually do not fix the real issue.
Water history
Old leaks, soft subfloor, or stained drywall usually mean the remodel needs corrective scope, not just cosmetics.
Layered patchwork
Multiple old fixes often hide inconsistent framing, wiring, plumbing, or surface prep.
Open-ended wish lists
The fastest way to lose budget is starting demo before priorities and allowances are clearly set.
Kitchen package (mid)
Semi-custom cabinets, quartz counters, mid-grade appliances, tile backsplash, LVP or tile floor.
Primary bath (full gut)
Custom tile shower, freestanding tub or glass enclosure, double vanity, heated floor option.
Basement finish
Framing, electrical, drywall, flooring, drop ceiling or drywall. Full bath adds ~$18K.
Whole-home refresh
Flooring, paint, trim, fixtures throughout. Great pre-sale or pre-move-in.
Discovery call
30-minute phone call to understand scope, timeline, budget range.
Design visit
On-site 1-2 hours. Measure, photograph, discuss. $250 fee, credited back.
Fixed-price bid
Line-item, all-inclusive. Valid 60 days. No change-orders without sign-off.
Pre-construction
Material approvals, final selections, crew scheduling.
Build
Typical kitchen: 6-10 weeks. Bath: 3-5 weeks. Basement: 4-8 weeks.
Browse our latest construction projects that showcase our commitment to quality, innovation and craftsmanship. Each project represents our dedication to excellence and client satisfaction.

Based in Hudson, we cover all of Penobscot County — and the closer neighborhoods of Hancock and Waldo counties. 45-minute radius from our yard, same-day response within 30
More questions? Call +1 (203) 725-5058 or request an estimate — we don't believe in pressure sales.